← Strategy

Data, Strategy, & Plan

These are initial programme scopes from the 17 October worksheet, not estimates of the five national aspirations. State shares are provisional allocation rules, not measured state needs. No policy outcomes or budgets are added across overlapping programmes or different periods.

12-month cohort

10 lakh paid technology apprenticeships

Sources

32.5% placed per trained candidate. PMKVY STT/SP, 2015–22: 23.18 lakh placements ÷ 71.37 lakh trained. The certified-only rate is 41.3%; PMKVY 3.0 alone was 13.5% among certified candidates.

Existing stipend mechanism; job creation depends on demand and displacement.

Sizing

Estimated cost · 12-month cohort₹2,090 croreRange: ₹1,942 crore–₹2,300 crore

Public ceiling; employer stipend balance and supervision extra. Demand must exist.

Cost = 10 lakh × (12 × ₹1,500 + verification) × (1 + administration). Conditional net jobs = slots × retained share × additionality share.

Assumptions & conditional outcomes

Government baseline: CAG Table 3.1 gives 68.01 lakh STT + 3.36 lakh SP trained; §3.6 gives 23.18 lakh placements. Excluding 0.75 lakh special COVID OJT candidates raises the rate slightly to 32.8%. PMKVY 3.0 certified-only placement was 13.5%, versus 51.1% in phase 2; its 2020–22 period includes the pandemic. Missing placements are not proof of unemployment. Retention and additionality are our scenarios. This is not a NAPS causal estimate. Do not sum successive cohort results as employment at a common date.

Low / base / high: 0, 2,00,000, 4,50,000 conditional net jobs. Scenarios, not forecasts.

slots
10,00,000
months
12
public monthly cap INR
1,500
verification INR
500, 1,000, 2,000
administration share
0.05, 0.1, 0.15
retained share all starters
0.2, 0.4, 0.6
net additional share of retained
0, 0.5, 0.75

National strategy

Fund paid apprenticeships with technology employers.

10,00,000 slots

Employer demand → paid apprenticeship → retained job → additional job after displacement.

Secure 10 lakh real technology-employer slots per cohort. An 80% placement promise means 8 lakh placed; the base model allows 4 lakh retained and 2 lakh net additional. Verify occupation, wages and employment at a common date.

Allocation · slots10,00,000
Estimated budget share20,90,00,00,000
  1. Secure 10,00,000 paid slots with named technology employers.
  2. Verify stipend payments and employer contributions.
  3. Measure occupation, wages and retention at six and twelve months.

Public ceiling; employer stipend balance and supervision extra. Demand must exist.

Allocation estimate · NAPS apprentices engaged, FY 2025–26

Weighted by actual all-sector apprenticeship engagement, a delivery-capacity proxy. Confirm technology-employer demand and additional paid slots before contracting.

36 state / UT allocations → 10,00,000 slots nationally

Slots · allocation estimate
State / UTSlots
Andaman & Nicobar Islands144
Andhra Pradesh21,538
Arunachal Pradesh166
Assam8,167
Bihar7,340
Chandigarh1,416
Chhattisgarh5,554
Dadra & Nagar Haveli and Daman & Diu3,339
Delhi24,701
Goa10,108
Gujarat88,791
Haryana70,021
Himachal Pradesh8,870
Jammu & Kashmir1,002
Jharkhand8,693
Karnataka94,749
Kerala12,639
Ladakh15
Lakshadweep11
Madhya Pradesh27,860
Maharashtra2,45,874
Manipur178
Meghalaya143
Mizoram228
Nagaland33
Odisha10,112
Puducherry4,848
Punjab20,888
Rajasthan26,259
Sikkim414
Tamil Nadu1,16,651
Telangana38,685
Tripura434
Uttar Pradesh86,545
Uttarakhand24,956
West Bengal28,628
National total10,00,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 12,27,903. State inputs and full model ↓

same training cohort

10 lakh trainees shown the jobs, wages and locations

Sources

No national retention baseline. CAG documents weak demand assessment. Local trial control retention was 62% among those placed; that is not India’s rate.

DDU-GKY study: +11 pp retained at least five months, conditional on placement. Not a causal net-job estimate.

Sizing

Estimated cost · training cohort₹40 croreRange: ₹20 crore–₹80 crore

Information, staff time and verification allowance; training itself excluded.

10 lakh × ₹200/400/800. Retained placements = 10 lakh × assumed 50% placed × 11 pp × assumed transfer.

Assumptions & conditional outcomes

The experiment conditions retention on placement. Selection can change; this arithmetic is not an all-starter causal effect or net new jobs. Overlaps with apprenticeship verification must be reconciled.

Low / base / high: 0, 27,500, 55,000 additional retained placements. Scenarios, not forecasts.

trainees
10,00,000
assumed cost INR per trainee
200, 400, 800
assumed placed share
0.5
local conditional retention gain pp
11
effect transfer share
0, 0.5, 1

National strategy

Require training courses to show the jobs, wages and locations on offer.

10,00,000 trainees

Accurate wage and location information → fewer unsuitable placements → better retention.

Reach the same 10 lakh trainees before they commit. Track five- and twelve-month retention; treat any gain as part of the apprenticeship retention rate, unless a combined evaluation establishes an extra effect.

Allocation · trainees10,00,000
Estimated budget share40,00,00,000
  1. Give 10,00,000 trainees two job-information sessions.
  2. Disclose the employer, wage, location and migration terms before commitment.
  3. Track retention in the same apprenticeship cohort.

Information, staff time and verification allowance; training itself excluded.

Allocation estimate · NAPS apprentices engaged, FY 2025–26

Weighted by actual all-sector apprenticeship engagement, a delivery-capacity proxy. Confirm technology-employer demand and additional paid slots before contracting.

36 state / UT allocations → 10,00,000 trainees nationally

Trainees · allocation estimate
State / UTTrainees
Andaman & Nicobar Islands144
Andhra Pradesh21,538
Arunachal Pradesh166
Assam8,167
Bihar7,340
Chandigarh1,416
Chhattisgarh5,554
Dadra & Nagar Haveli and Daman & Diu3,339
Delhi24,701
Goa10,108
Gujarat88,791
Haryana70,021
Himachal Pradesh8,870
Jammu & Kashmir1,002
Jharkhand8,693
Karnataka94,749
Kerala12,639
Ladakh15
Lakshadweep11
Madhya Pradesh27,860
Maharashtra2,45,874
Manipur178
Meghalaya143
Mizoram228
Nagaland33
Odisha10,112
Puducherry4,848
Punjab20,888
Rajasthan26,259
Sikkim414
Tamil Nadu1,16,651
Telangana38,685
Tripura434
Uttar Pradesh86,545
Uttarakhand24,956
West Bengal28,628
National total10,00,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 12,27,903. State inputs and full model ↓

five-year rollout; first-year costs

12,828 more neighbourhood childcare centres

Sources

4,172 / 17,000 centres. 24.5% operating against the establishment target; August 2026 actual.

Palna supplies an operating model. Parent employment conversion is not established by opening a centre.

Sizing

Estimated cost · first year₹1,668 croreRange: ₹1,026 crore–₹2,566 crore

Staff, food, space, utilities and oversight allowances; land purchase and major construction excluded.

Centres × (setup + annual operations). Capacity = 12,828 × 25 = 3,20,700 places. Parent employment = capacity × occupancy × assumed conversion.

Assumptions & conditional outcomes

Not official Palna cost norms. Existing compatible premises assumed. Childcare can improve time and wellbeing without creating jobs. New caregiver posts and parent jobs are not technology-job counts.

Low / base / high: 0, 24052.5, 57,726 conditional working parents. Scenarios, not forecasts.

additional centres
12,828
assumed places per centre
25
assumed setup INR
2,00,000, 4,00,000, 8,00,000
assumed annual operating INR
6,00,000, 9,00,000, 12,00,000
occupancy share
0.6, 0.75, 0.9
parent new employment conversion
0, 0.1, 0.2

National strategy

Expand neighbourhood childcare so parents can take paid work.

12,828 centres · 3,20,700 childcare places

Reliable childcare → time available for work → employment if a suitable job exists.

Open and staff 12,828 remaining Palna centres: about 2,566 a year over five years. Provide 3,20,700 places at 25 per centre. Parent employment is not automatically a technology job.

Allocation · centres12,828
Estimated budget share16676400000.000002
  1. Open and staff 12,828 childcare centres.
  2. Provide 3,20,700 places, with hours matched to local work.
  3. Check attendance, safety and parents’ employment separately.

Staff, food, space, utilities and oversight allowances; land purchase and major construction excluded.

Allocation estimate · Children under five · population × NFHS-6

Weighted by estimated children under five; 25 places per centre is assumed. Population projections × NFHS-6 survey rates are planning proxies. Manipur, absent from NFHS-6, uses the national rate.

36 state / UT allocations → 12,828 centres nationally

Centres · allocation estimate
State / UTCentresChildcare places
Andaman & Nicobar Islands250
Andhra Pradesh41810,450
Arunachal Pradesh11275
Assam2867,150
Bihar1,71642,900
Chandigarh9225
Chhattisgarh2676,675
Dadra & Nagar Haveli and Daman & Diu13325
Delhi1684,200
Goa10250
Gujarat61015,250
Haryana2796,975
Himachal Pradesh551,375
Jammu & Kashmir1172,925
Jharkhand45311,325
Karnataka50612,650
Kerala2496,225
Ladakh250
Lakshadweep125
Madhya Pradesh85021,250
Maharashtra93323,325
Manipur30750
Meghalaya34850
Mizoram9225
Nagaland20500
Odisha3789,450
Puducherry11275
Punjab2155,375
Rajasthan84021,000
Sikkim375
Tamil Nadu54213,550
Telangana3097,725
Tripura33825
Uttar Pradesh2,57564,375
Uttarakhand1032,575
West Bengal77119,275
National total12,8283,20,700
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 11,37,36,003. State inputs and full model ↓

16-month cycle; existing schools

1 lakh schools with extra reading and maths lessons

Sources

44.8% reading proficiency. Rural government Class V reading Class II text, 2024. Up from 38.5% in 2022.

Assam: combined camps/study groups worked; each alone did not. Table 1: +4 pp Grade II language proficiency.

Sizing

Estimated cost · 16-month cycle₹2,500 croreRange: ₹2,000 crore–₹3,000 crore

Supported learning package, including coaching below; existing school costs extra.

1 crore children × ₹2,000/2,500/3,000. Conditional additional pupils reaching Grade II language = 1 crore × 4 pp × transfer.

Assumptions & conditional outcomes

Assam table 1 reports a 4 pp Grade II language gain, separate from the roughly 0.1 SD test-score effect. Extrapolation to this larger cohort is assumed, not national Class V progress.

Low / base / high: 0, 2,00,000, 4,00,000 additional proficient pupils. Scenarios, not forecasts.

children
1,00,00,000
assumed cost INR per child
2,000, 2,500, 3,000
trial gradeII language gain pp
4
effect transfer share
0, 0.5, 1

National strategy

Give children who are behind extra reading and maths lessons at their level.

1,00,000 schools · 1,00,00,000 children

Assess each child → teach at their level → retest reading and maths.

Reach 100 children in each of 1 lakh existing schools. At an ASER-like 44.8% starting rate, 70% proficiency requires 25.2 lakh additional readers in this 1-crore-child cohort. Measure its actual baseline before contracting.

Allocation · schools1,00,000
Estimated budget share25,00,00,00,000
  1. Select 1,00,000 existing government schools.
  2. Assess 1,00,00,000 children and group lessons by reading and maths level.
  3. Fund lessons and coaching together; measure the endline independently.

Supported learning package, including coaching below; existing school costs extra.

Allocation estimate · Government schools, UDISE+ 2025–26

One shared allocation: 20 schools and 2,000 catch-up children per coach; 200 adaptive-learning pupils per coach. Select eligible pupils within those schools.

36 state / UT allocations → 1,00,000 schools nationally

Schools · allocation estimate
State / UTSchoolsChildren
Andaman & Nicobar Islands404,000
Andhra Pradesh4,4004,40,000
Arunachal Pradesh24024,000
Assam4,4204,42,000
Bihar7,6007,60,000
Chandigarh00
Chhattisgarh4,8604,86,000
Dadra & Nagar Haveli and Daman & Diu404,000
Delhi26026,000
Goa808,000
Gujarat3,4603,46,000
Haryana1,4201,42,000
Himachal Pradesh1,4401,44,000
Jammu & Kashmir1,8601,86,000
Jharkhand3,5603,56,000
Karnataka4,8204,82,000
Kerala48048,000
Ladakh808,000
Lakshadweep00
Madhya Pradesh9,0809,08,000
Maharashtra6,4206,42,000
Manipur30030,000
Meghalaya56056,000
Mizoram26026,000
Nagaland18018,000
Odisha4,8404,84,000
Puducherry404,000
Punjab1,9201,92,000
Rajasthan6,9606,96,000
Sikkim808,000
Tamil Nadu3,7403,74,000
Telangana2,8002,80,000
Tripura42042,000
Uttar Pradesh13,64013,64,000
Uttarakhand1,5801,58,000
West Bengal8,1208,12,000
National total1,00,0001,00,00,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 10,05,245. State inputs and full model ↓

two-year programme

10 lakh pupils in supervised adaptive computer lessons

Sources

No national delivered-use measure. A lab or device count is not supervised learning time. The local trial is the effect benchmark.

Rajasthan randomized study: +0.22 SD maths and +0.20 SD Hindi after 18 months; support mattered.

Sizing

Estimated cost · two-year programme₹819 croreRange: ₹655 crore–₹1,092 crore

Historical delivered programme includes support, annualized hardware and licence assumptions; upfront cash needs can differ.

10 lakh × historical $78 × study ₹70/$ × assumed cost uplift. Maths effect = 0.22 SD × transfer.

Assumptions & conditional outcomes

Effects measured after 18 months; two-year costs used. Adaptation, prices and usage may differ. No conversion of SD to readers; no addition to catch-up effects without a combined evaluation.

Low / base / high: 0, 0.11, 0.22 SD maths gain. Scenarios, not forecasts.

pupils
10,00,000
historical two year USD per pupil
78
historical INR per USD
70
assumed cost uplift
1.2, 1.5, 2
local math gain SD
0.22
local Hindi gain SD
0.2
effect transfer share
0, 0.5, 1

National strategy

Add supervised computer lessons that adapt to each child’s level.

10,00,000 pupils

Supervised adaptive lessons → more useful practice → measured learning gain.

The current 10 lakh pupils cover 10% of the catch-up cohort. Reaching all 1 crore would require 10 times the delivered programme capacity and two-year budget. Test the combined package before scaling.

Allocation · pupils10,00,000
Estimated budget share8,19,00,00,000
  1. Provide supervised adaptive lessons for 10,00,000 pupils.
  2. Contract working devices, licences and classroom support.
  3. Measure attendance, uptime and independent learning results.

Historical delivered programme includes support, annualized hardware and licence assumptions; upfront cash needs can differ.

Allocation estimate · Government schools, UDISE+ 2025–26

One shared allocation: 20 schools and 2,000 catch-up children per coach; 200 adaptive-learning pupils per coach. Select eligible pupils within those schools.

36 state / UT allocations → 10,00,000 pupils nationally

Pupils · allocation estimate
State / UTPupils
Andaman & Nicobar Islands400
Andhra Pradesh44,000
Arunachal Pradesh2,400
Assam44,200
Bihar76,000
Chandigarh0
Chhattisgarh48,600
Dadra & Nagar Haveli and Daman & Diu400
Delhi2,600
Goa800
Gujarat34,600
Haryana14,200
Himachal Pradesh14,400
Jammu & Kashmir18,600
Jharkhand35,600
Karnataka48,200
Kerala4,800
Ladakh800
Lakshadweep0
Madhya Pradesh90,800
Maharashtra64,200
Manipur3,000
Meghalaya5,600
Mizoram2,600
Nagaland1,800
Odisha48,400
Puducherry400
Punjab19,200
Rajasthan69,600
Sikkim800
Tamil Nadu37,400
Telangana28,000
Tripura4,200
Uttar Pradesh1,36,400
Uttarakhand15,800
West Bengal81,200
National total10,00,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 10,05,245. State inputs and full model ↓

per year; included in catch-up budget

5,000 classroom coaches for 1 lakh schools

Sources

100,843 single-teacher schools. All managements, 2025–26; down 3.2%. Map public staffing separately.

Coaching enables the catch-up package. It shares pupils and evidence with row 1.

Sizing

Estimated cost · year; included in row 1₹500 croreRange: ₹350 crore–₹700 crore

An allocation within the catch-up envelope, not an extra budget line.

1 lakh schools ÷ 20 schools per coach × ₹7/10/14 lakh annual staff and travel.

Assumptions & conditional outcomes

The full 16-month coaching allocation is 4/3 of this annual figure. Check it fits the catch-up grant. The evidence family and pupil outcomes overlap row 1; extra impact is not added.

Low / base / high: shared outcome, shared outcome, shared outcome shared learning effect. Scenarios, not forecasts.

schools
1,00,000
assumed schools per coach
20
coaches
5,000
assumed annual coach and travel INR
7,00,000, 10,00,000, 14,00,000

National strategy

Give teachers regular classroom coaching and track children’s progress.

5,000 coaches

5,000 coaches → regular visits to 20 schools each → better delivery of catch-up lessons.

Staff all 5,000 posts and schedule school visits and independent assessments. Coaching is already inside the catch-up budget and learning effect; it does not create a second set of proficient pupils.

Allocation · coaches5,000
Estimated budget share5,00,00,00,000
  1. Assign 5,000 coaches to participating schools.
  2. Schedule classroom visits and repeat reading and maths assessments.
  3. Keep coaching inside the catch-up budget and its shared learning outcome.

An allocation within the catch-up envelope, not an extra budget line.

Allocation estimate · Government schools, UDISE+ 2025–26

One shared allocation: 20 schools and 2,000 catch-up children per coach; 200 adaptive-learning pupils per coach. Select eligible pupils within those schools.

36 state / UT allocations → 5,000 coaches nationally

Coaches · allocation estimate
State / UTCoaches
Andaman & Nicobar Islands2
Andhra Pradesh220
Arunachal Pradesh12
Assam221
Bihar380
Chandigarh0
Chhattisgarh243
Dadra & Nagar Haveli and Daman & Diu2
Delhi13
Goa4
Gujarat173
Haryana71
Himachal Pradesh72
Jammu & Kashmir93
Jharkhand178
Karnataka241
Kerala24
Ladakh4
Lakshadweep0
Madhya Pradesh454
Maharashtra321
Manipur15
Meghalaya28
Mizoram13
Nagaland9
Odisha242
Puducherry2
Punjab96
Rajasthan348
Sikkim4
Tamil Nadu187
Telangana140
Tripura21
Uttar Pradesh682
Uttarakhand79
West Bengal406
National total5,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 10,05,245. State inputs and full model ↓

one year of continuous care

1 crore patients receiving year-round blood-pressure care

Sources

17% blood-pressure control. WHO modelled 2024 estimate for adults 30–79 with hypertension.

Kerala trial: roughly 4.1 mmHg extra systolic reduction. The cohort-control calculation is our assumption.

Sizing

Estimated cost · year₹9,730 croreRange: ₹7,784 crore–₹13,690 crore

₹1,054–2,474 crore clinic resource cost plus community support; existing facilities.

Clinic cost + annualized peer programme, as in calculations.json. Conditional additional controlled = 1 crore × (end control − assumed 17% entry control).

Assumptions & conditional outcomes

National 17% is only a planning proxy for cohort entry, not measured enrolled-patient control. End-control rates are assumptions; the trial measured BP change. Referrals, major capacity and patient time extra.

Low / base / high: 0, 16,00,000, 33,00,000 additional controlled patients. Scenarios, not forecasts.

patient years
1,00,00,000
visits per year
4
historical visit INR by scenario
183.03, 183.03, 257.68
assumed cost uplift
1.2, 1.5, 2
assumed clinic delivery topup
0.2
trial peer programme USD
36,680
trial peer participants
968
trial months
6
trial INR per USD
74
assumed annual peer repeats
2
assumed controlled share at enrolment
0.17
assumed controlled share after
0.17, 0.33, 0.5

National strategy

Train local health workers to check blood pressure and follow up on treatment.

1,00,00,000 patients

Find hypertension → continuous medicines and follow-up → sustained control.

Maintain 1 crore patient-years of care and measure baseline and endline control. The base case reaches 33% cohort control; the planned 50% service ambition is the upside assumption, not the base result.

Allocation · patients1,00,00,000
Estimated budget share97299647603.30579
  1. Enrol 1,00,00,000 patients in continuous blood-pressure care.
  2. Fund medicines, clinical follow-up and community support.
  3. Measure blood-pressure control at enrolment and after one year.

₹1,054–2,474 crore clinic resource cost plus community support; existing facilities.

Allocation estimate · Adults with raised BP · population × NFHS-6

Weighted by estimated adults aged 15+ with raised BP or taking medicine; equal female/male weights assumed. This is separate from the national 30–79 WHO denominator. Population projections × NFHS-6 survey rates are planning proxies. Manipur, absent from NFHS-6, uses the national rate.

36 state / UT allocations → 1,00,00,000 patients nationally

Patients · allocation estimate
State / UTPatients
Andaman & Nicobar Islands4,209
Andhra Pradesh4,82,389
Arunachal Pradesh15,818
Assam2,54,142
Bihar6,17,387
Chandigarh10,684
Chhattisgarh2,09,327
Dadra & Nagar Haveli and Daman & Diu8,805
Delhi1,96,359
Goa15,979
Gujarat5,59,947
Haryana1,94,387
Himachal Pradesh76,008
Jammu & Kashmir1,08,837
Jharkhand1,94,314
Karnataka6,51,430
Kerala4,49,135
Ladakh1,689
Lakshadweep729
Madhya Pradesh4,47,500
Maharashtra12,08,520
Manipur23,259
Meghalaya18,543
Mizoram7,986
Nagaland20,402
Odisha3,92,874
Puducherry17,190
Punjab2,84,129
Rajasthan4,24,578
Sikkim9,292
Tamil Nadu7,36,766
Telangana3,62,021
Tripura33,769
Uttar Pradesh10,13,467
Uttarakhand67,124
West Bengal8,81,005
National total1,00,00,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 220056447.664. State inputs and full model ↓

one birth cohort

10 lakh births covered by ASHA pregnancy and newborn-care groups

Sources

17 neonatal deaths / 1,000 births. National 2023 rate, down from 28 in 2015. Select higher-risk areas for this intervention.

Jharkhand nonrandomized rollout: adjusted mortality odds ratio 0.76. Transfer needs similar high-risk conditions.

Sizing

Estimated cost · birth cohort₹50 croreRange: ₹37 crore–₹75 crore

Programme-provider cost; paid worker time uplift assumed. Participant time and referral care extra.

10 lakh births × INT$9.4 × study PPP ₹21.2 × uplift × 1.25. Deaths averted = births × [p − OR×p/(1−p+OR×p)], p=0.03.

Assumptions & conditional outcomes

High-risk catchments assumed at 30 deaths/1,000, not the national 17 baseline. Nonrandomized Jharkhand odds ratio may not transfer. This is an explicit risk model, not a mortality forecast or guaranteed benefit.

Low / base / high: 0, 3504.6166198313895, 7034.649476228845 conditional neonatal deaths averted. Scenarios, not forecasts.

live births in service area
10,00,000
historical INT dollars per birth
9.4
study INR per INT dollar
21.2
assumed cost uplift
1.5, 2, 3
assumed delivery topup
0.25
assumed high risk baseline neonatal death probability
0.03
assumed transferred odds ratio
1, 0.88, 0.76

National strategy

Pay and train ASHA workers to run pregnancy and newborn-care groups.

10,00,000 births in service areas

Paid ASHA groups → earlier recognition and care seeking → functioning referral care.

Serve catchments containing 10 lakh births, verify the assumed high-risk mortality baseline, and staff the referral pathway. At 100 births per worker per year, an illustrative workload is 10,000 worker-equivalents; this is a staffing assumption, not an official norm.

Allocation · births in service areas10,00,000
Estimated budget share49,82,00,000
  1. Cover catchments containing 10,00,000 births.
  2. Train and pay ASHA workers; staff pregnancy and newborn-care groups.
  3. Verify local mortality risk and referral access; monitor all births.

Programme-provider cost; paid worker time uplift assumed. Participant time and referral care extra.

Allocation estimate · Rural child-cohort proxy in states with reported ASHAs

Initial phase uses rural under-five shares in states with reported ASHAs. Delhi, Goa and Chandigarh need a verified delivery workforce before inclusion. This is not a count of current live births or high-risk pregnancies. Population projections × NFHS-6 survey rates are planning proxies. Manipur, absent from NFHS-6, uses the national rate.

36 state / UT allocations → 10,00,000 births in service areas nationally

Births in service areas · allocation estimate
State / UTBirths in service areas
Andaman & Nicobar Islands108
Andhra Pradesh30,238
Arunachal Pradesh985
Assam28,169
Bihar1,75,984
Chandigarh0
Chhattisgarh22,563
Dadra & Nagar Haveli and Daman & Diu0
Delhi0
Goa0
Gujarat35,619
Haryana18,363
Himachal Pradesh5,749
Jammu & Kashmir9,467
Jharkhand38,915
Karnataka32,100
Kerala5,439
Ladakh181
Lakshadweep0
Madhya Pradesh70,411
Maharashtra55,439
Manipur2,339
Meghalaya3,207
Mizoram491
Nagaland1,180
Odisha35,691
Puducherry389
Punjab14,422
Rajasthan71,831
Sikkim172
Tamil Nadu28,598
Telangana18,110
Tripura2,201
Uttar Pradesh2,28,077
Uttarakhand7,558
West Bengal56,004
National total10,00,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 7,56,13,632. State inputs and full model ↓

per year

1,000 low-coverage villages with vaccination outreach

Sources

97.9% reported full immunisation. FY2025–26 national programme figure; high coverage is counterevidence to a blanket failure claim.

Haryana full package: +4.02 measles vaccinations/village/month. Cheaper messengers/reminders often offered better value.

Sizing

Estimated cost · year₹9 croreRange: ₹4 crore–₹18 crore

Incremental outreach/reward allowance. Vaccines, cold chain and clinical sessions must have funded capacity.

1,000 × 150 eligible children × ₹300/600/1,200. Additional measles vaccinations = 1,000 × 12 × 4.02 × transfer, capped by locally verified missed children.

Assumptions & conditional outcomes

Village dose counts are not a national full-immunisation percentage. The historical trial used measles as a completion proxy. Do not apply the 55% relative effect to national 97.9% coverage; focus on low-coverage areas.

Low / base / high: 0, 24,120, 48,240 additional measles vaccinations. Scenarios, not forecasts.

villages
1,000
assumed eligible children each
150
assumed outreach and reward INR per child
300, 600, 1,200
local extra measles doses per village month
4.02
effect transfer share
0, 0.5, 1

National strategy

Use local health messengers, reminders and small rewards to help families finish vaccinations.

1,000 villages · 1,50,000 eligible children (assumed)

Identify missed children → reminders and local messengers → completed vaccination visits.

Map 1.5 lakh eligible children in 1,000 villages. Fund vaccine supply, clinical sessions and cold chain separately. Cap additional doses by children actually missing that dose; doses cannot be summed with lives saved or BP controls.

Allocation · villages1,000
Estimated budget share9,00,00,000
  1. Identify 1,000 low-coverage villages.
  2. Map 1,50,000 eligible children and verify which doses they missed.
  3. Coordinate outreach with vaccine supply, clinical sessions and cold-chain capacity.

Incremental outreach/reward allowance. Vaccines, cold chain and clinical sessions must have funded capacity.

Allocation estimate · Missed first measles doses · child-cohort proxy × NFHS-6

Weighted by an annual child-cohort proxy × the state first-measles-dose gap. Select low-coverage villages and verify missed doses locally; 150 eligible children per village is assumed. Population projections × NFHS-6 survey rates are planning proxies. Manipur, absent from NFHS-6, uses the national rate.

36 state / UT allocations → 1,000 villages nationally

Villages · allocation estimate
State / UTVillagesEligible children (assumed)
Andaman & Nicobar Islands00
Andhra Pradesh162,400
Arunachal Pradesh2300
Assam253,750
Bihar16224,300
Chandigarh1150
Chhattisgarh253,750
Dadra & Nagar Haveli and Daman & Diu00
Delhi253,750
Goa00
Gujarat619,150
Haryana263,900
Himachal Pradesh2300
Jammu & Kashmir6900
Jharkhand446,600
Karnataka213,150
Kerala172,550
Ladakh00
Lakshadweep00
Madhya Pradesh639,450
Maharashtra578,550
Manipur2300
Meghalaya5750
Mizoram1150
Nagaland4600
Odisha213,150
Puducherry00
Punjab162,400
Rajasthan7611,400
Sikkim00
Tamil Nadu284,200
Telangana213,150
Tripura5750
Uttar Pradesh23034,500
Uttarakhand4600
West Bengal345,100
National total1,0001,50,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 1901895.5565999998. State inputs and full model ↓

per year

10 lakh farmers with daily prices and real buyer offers

Sources

1.80 crore e-NAM registrations. 1,656 mandis by March 2026. Registration does not establish net sale-price gains.

Historical MP intervention: 1–3% higher soy mandi prices; information came with an alternative selling channel.

Sizing

Estimated cost · year₹50 croreRange: ₹20 crore–₹100 crore

Price verification and buyer-access service allowance; procurement, grading and freight infrastructure extra.

Cost = 10 lakh × ₹200/500/1,000. Gross sale uplift = 10 lakh × assumed ₹2 lakh sales × 0/1/2%.

Assumptions & conditional outcomes

Historic MP price effects came with a credible alternative selling channel. Farmer transaction costs still need deduction. Higher prices are income/terms-of-trade gains, not extra tonnes or national real output.

Low / base / high: 0, 2,00,00,00,000, 4,00,00,00,000 gross sale uplift. Scenarios, not forecasts.

farmers
10,00,000
assumed annual crop sales INR each
2,00,000
assumed service INR each
200, 500, 1,000
assumed realised price gain share
0, 0.01, 0.02

National strategy

Publish daily crop prices so farmers can compare buyers before selling.

10,00,000 farmers

Verified executable bids → competing buyers → better realised sale prices.

Serve 10 lakh farmers with usable buyer offers, not registrations alone. At ₹2 lakh annual crop sales, the base 1% gain is ₹2,000 gross per farmer. This is a price effect, not more physical output.

Allocation · farmers10,00,000
Estimated budget share50,00,00,000
  1. Serve 10,00,000 farmers with verified daily prices.
  2. Offer real buyers, grades, sale terms and transport information.
  3. Track farmers’ net receipts after selling costs.

Price verification and buyer-access service allowance; procurement, grading and freight infrastructure extra.

Allocation estimate · Operational holdings, Agriculture Census 2015–16

Weighted by 2015–16 operational farm holdings, which are not unique farmers. Jammu & Kashmir includes Ladakh.

35 state / UT allocations → 10,00,000 farmers nationally

Farmers · allocation estimate
State / UTFarmers
Andaman & Nicobar Islands82
Andhra Pradesh58,202
Arunachal Pradesh773
Assam18,721
Bihar1,12,069
Chandigarh5
Chhattisgarh27,386
Dadra & Nagar Haveli and Daman & Diu158
Delhi142
Goa509
Gujarat36,330
Haryana11,116
Himachal Pradesh6,806
Jammu & Kashmir + Ladakh9,672
Jharkhand19,139
Karnataka59,273
Kerala51,781
Lakshadweep68
Madhya Pradesh68,302
Maharashtra1,04,370
Manipur1,028
Meghalaya1,587
Mizoram613
Nagaland1,342
Odisha33,225
Puducherry231
Punjab7,461
Rajasthan52,266
Sikkim488
Tamil Nadu54,201
Telangana40,612
Tripura3,914
Uttar Pradesh1,62,656
Uttarakhand6,018
West Bengal49,454
National total10,00,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 14,64,53,741. State inputs and full model ↓

one rice season; ten-state first phase

1 lakh rice farmers trained in water-saving irrigation

Sources

National AWD adoption unresolved. A rice-specific practice; do not substitute micro-irrigation coverage or annual water volume.

Haryana reference: 22% lower pumping during peak weeks; no supported national harvest multiplier.

Sizing

Estimated cost · rice season₹25 croreRange: ₹10 crore–₹50 crore

Training, field checks and measurement allowance; major irrigation works excluded.

1 lakh farmers × training/measurement allowance. Peak-window hours saved = 1 lakh × 100 hours × adoption × pumping reduction.

Assumptions & conditional outcomes

Peak pumping hours are not annual groundwater volume. The 22% reference is from indexed primary text with direct access limited. Flow rates and yield crop cuts must be measured; no extra harvest effect is booked.

Low / base / high: 0, 7,70,000, 19,80,000 peak-window pumping hours saved. Scenarios, not forecasts.

rice farmers
1,00,000
assumed peak window baseline pump hours each
100
assumed adoption share
0.5, 0.7, 0.9
assumed peak pumping reduction share
0, 0.11, 0.22
assumed delivery INR each
1,000, 2,500, 5,000

National strategy

Train rice farmers to use less irrigation water without reducing harvests.

1,00,000 rice farmers

Suitable rice plots + controlled irrigation → less pumping while maintaining yield.

Train 1 lakh farmers; the base adoption assumption is 70,000 users. Verify pumping hours and crop cuts on the same plots. Labour, water volume and harvest increases need separate measurement.

Allocation · rice farmers1,00,000
Estimated budget share25,00,00,000
  1. Train 1,00,000 rice farmers on suitable irrigated plots.
  2. Verify water control and monitor adoption on those plots.
  3. Compare pumping hours and crop-cut yields on the same plots.

Training, field checks and measurement allowance; major irrigation works excluded.

Allocation estimate · Irrigated rice area proxy, 2023–24

Ten-state first phase, weighted by rice hectares × irrigation share. Other states are outside this phase. Confirm controllable water and plot suitability.

10 state / UT allocations → 1,00,000 rice farmers nationally

Rice farmers · allocation estimate
State / UTRice farmers
Andhra Pradesh6,782
Bihar8,823
Chhattisgarh4,764
Madhya Pradesh8,436
Odisha5,296
Punjab11,520
Tamil Nadu7,130
Telangana16,831
Uttar Pradesh19,325
West Bengal11,093
National total1,00,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 2,75,28,127. State inputs and full model ↓

six-month lending cycle

₹1,000 crore in crop-backed loans for 1 lakh farmers

Sources

Receipt finance already exists. Working paper finds price/seasonality effects. Current farmer net gains after all fees remain unmeasured here.

Historical market evidence supports investigating the mechanism. Full loan economics decide whether farmers gain.

Sizing

Estimated cost · six-month lending cycle₹40 croreRange: ₹15 crore–₹70 crore

Public risk reserve and administration, not the ₹1,000 crore repayable principal. No new warehouses included.

₹1,000 crore credit stock; public provision = stock × 1/3/5% + administration. Farmer net gain = ₹1,500 crore crop value × price gain − ₹1,000 crore × annual interest × 0.5 − crop value × storage/loss fees.

Assumptions & conditional outcomes

All price, financing, loss and default assumptions require local evidence. Conditional farmer gain can be negative. Market price effects in the paper do not price this loan or guarantee farmer profit.

Low / base / high: -,55,00,00,000, 45,00,00,000, 1,45,00,00,000 net farmer gain / loss. Scenarios, not forecasts.

borrowers
1,00,000
assumed loan INR each
1,00,000
assumed stored crop value INR each
1,50,000
months
6
assumed sale price gain share
0.05, 0.1, 0.15
assumed annual interest share
0.14, 0.12, 0.1
assumed storage loss and fees share
0.04, 0.03, 0.02
assumed public credit loss reserve share
0.01, 0.03, 0.05
assumed admin INR each
500, 1,000, 2,000

National strategy

Offer loans against crops in registered warehouses, so farmers can wait to sell.

1,00,000 borrowers · 10,00,00,00,000 loan principal (₹)

Warehouse receipts → working capital → later sale if the price gain exceeds carrying costs.

Arrange ₹1,000 crore of actual lender credit for 1 lakh borrowers and sufficient registered storage. The public reserve is not the loan capital. A base 10% sale-price rise must exceed the 7% break-even carrying cost.

Allocation · borrowers1,00,000
Estimated budget share40,00,00,000
  1. Arrange crop-backed loans for 1,00,000 borrowers.
  2. Secure 10,00,00,00,000 of lender credit and registered storage.
  3. Disclose interest, fees and insurance; compare later sale receipts with carrying costs.

Public risk reserve and administration, not the ₹1,000 crore repayable principal. No new warehouses included.

Allocation estimate · Farm holdings with reported registered storage

Farm-holding shares within states with active WDRA-registered capacity. Jammu & Kashmir includes Ladakh. States with no reported capacity are outside this phase. Registered capacity is not vacant or contracted capacity.

35 state / UT allocations → 1,00,000 borrowers nationally

Borrowers · allocation estimate
State / UTBorrowersLoan principal (₹)
Andaman & Nicobar Islands00
Andhra Pradesh5,85158,51,00,000
Arunachal Pradesh00
Assam1,88218,82,00,000
Bihar11,2671,12,67,00,000
Chandigarh00
Chhattisgarh2,75327,53,00,000
Dadra & Nagar Haveli and Daman & Diu00
Delhi1414,00,000
Goa00
Gujarat3,65236,52,00,000
Haryana1,11811,18,00,000
Himachal Pradesh6846,84,00,000
Jammu & Kashmir + Ladakh9729,72,00,000
Jharkhand1,92419,24,00,000
Karnataka5,95959,59,00,000
Kerala5,20652,06,00,000
Lakshadweep00
Madhya Pradesh6,86768,67,00,000
Maharashtra10,4931,04,93,00,000
Manipur00
Meghalaya00
Mizoram00
Nagaland1351,35,00,000
Odisha3,34033,40,00,000
Puducherry2323,00,000
Punjab7507,50,00,000
Rajasthan5,25552,55,00,000
Sikkim00
Tamil Nadu5,44954,49,00,000
Telangana4,08340,83,00,000
Tripura3933,93,00,000
Uttar Pradesh16,3531,63,53,00,000
Uttarakhand6056,05,00,000
West Bengal4,97249,72,00,000
National total1,00,00010,00,00,00,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 14,56,75,931. State inputs and full model ↓

first year; existing compatible pipes

10 lakh households with treated, tested tap water

Sources

76% microbiological test passes. 2024 samples from working taps in surveyed Har Ghar Jal villages; not all Indian households.

Odisha trial: 70% relative reduction in tap E. coli; not a 70 pp increase in safe water.

Sizing

Estimated cost · first year₹41 croreRange: ₹22 crore–₹172 crore

Treatment on compatible existing networks; new connections, major repairs and chemical treatment extra.

Annual = 5,000 × (18 × refill × price factor + operator + tests + maintenance) × (1 + oversight). First year adds 5,000 × (parts + installation). E. coli decline = assumed 30% local prevalence × 0/35/70% relative reduction.

Assumptions & conditional outcomes

The local 30% E. coli baseline is assumed. JJM’s 24% microbiological failure rate includes other tests and cannot be substituted into this formula. The 95% promise is broader than this effect scenario.

Low / base / high: 0, 10.5, 21 pp reduction in E. coli prevalence. Scenarios, not forecasts.

households
10,00,000
schemes
5,000
assumed households per scheme
200
device parts INR reference
4,000, 4,000, 25,500
assumed installation INR
3,000, 6,000, 10,000
refill INR reference
432, 432, 4,700
assumed refills per year
18
assumed refill price factor
1, 1.5, 2
assumed annual operator INR
12,000, 24,000, 36,000
assumed annual testing INR
6,000, 12,000, 24,000
assumed annual maintenance INR
6,000, 12,000, 18,000
assumed oversight share
0.15, 0.2, 0.25
assumed local Ecoli prevalence pct
30
relative effect transfer
0, 0.35, 0.7

National strategy

Connect homes to safe tap water and publish water-quality tests.

5,000 water schemes · 10,00,000 households

Fund operators, chlorination and tests → detect failures → restore safe service.

Treat 5,000 compatible schemes serving an assumed 10 lakh households. The existing budget funds no new household connections. New pipes, source capacity and chemical-contaminant treatment require separate projects.

Allocation · water schemes5,000
Estimated budget share40,79,84,000
  1. Select 5,000 compatible piped-water schemes.
  2. Serve 10,00,000 households with funded operators, refills and tests.
  3. Publish test results and repair or treat failures.

Treatment on compatible existing networks; new connections, major repairs and chemical treatment extra.

Allocation estimate · Existing HGJ households × water-quality gap, 2024

Weighted by estimated HGJ households × failed microbiological/pH tests in the 2024 assessment. Confirm compatible pipes and the cause of failure; this is not an E. coli-only prevalence. Delhi and Chandigarh are outside the assessed phase.

36 state / UT allocations → 5,000 water schemes nationally

Water schemes · allocation estimate
State / UTWater schemesHouseholds
Andaman & Nicobar Islands2400
Andhra Pradesh5811,600
Arunachal Pradesh316,200
Assam11823,600
Bihar6061,21,200
Chandigarh00
Chhattisgarh163,200
Dadra & Nagar Haveli and Daman & Diu204,000
Delhi00
Goa224,400
Gujarat1,3252,65,000
Haryana19238,400
Himachal Pradesh428,400
Jammu & Kashmir81,600
Jharkhand438,600
Karnataka11723,400
Kerala5811,600
Ladakh00
Lakshadweep1200
Madhya Pradesh33066,000
Maharashtra31162,200
Manipur3600
Meghalaya183,600
Mizoram71,400
Nagaland112,200
Odisha12324,600
Puducherry3600
Punjab19739,400
Rajasthan5210,400
Sikkim2400
Tamil Nadu28256,400
Telangana21943,800
Tripura81,600
Uttar Pradesh7031,40,600
Uttarakhand265,200
West Bengal469,200
National total5,00010,00,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 21358807.536. State inputs and full model ↓

five-year rollout

1,000 villages with all-weather roads and fibre

Sources

42,000 villages at ≥95% uptime. OFC service metric, December 2025; distinct from service-ready gram panchayats.

Road access and internet service are complementary. Their combined income/job effect is not established.

Sizing

Estimated cost · five-year delivery envelope₹6,210 croreRange: ₹4,788 crore–₹9,315 crore

Road programme-average benchmark and assumed last-mile fibre budget; exceptional land/bridge costs and services beyond five years extra.

5,000 km × ₹1.122 crore/km × site factor + 1,000 villages × (fibre capital + 5 years O&M). Annual time = 1,000 × 100 commuters × 2 × 250 × minutes/60.

Assumptions & conditional outcomes

Travel-time savings are our scenario, not the road study’s measured income effect. Broadband uptime is a separate contract metric. Do not convert connectivity or saved time into new jobs without evidence.

Low / base / high: 0, 1,25,00,000, 2,50,00,000 commuting hours saved per year. Scenarios, not forecasts.

villages
1,000
assumed road km each
5
road reference crore per km
1.122
assumed road cost factor
0.8, 1, 1.5
assumed fibre capital INR per village
20,00,000, 40,00,000, 60,00,000
assumed fibre annual OandM INR per village
2,00,000, 4,00,000, 6,00,000
assumed commuters each
100
assumed minutes saved per trip
0, 15, 30
trips per workday
2
workdays per year
250

National strategy

Extend all-weather roads and fibre internet to underserved villages.

1,000 villages · 5,000 road km

Road access + usable fibre → shorter journeys and reliable digital access.

Deliver 5,000 km of roads and working last-mile fibre in 1,000 villages. Across five years that is 1,000 road km and 200 villages a year. Count households actually served; uptime at a network node is insufficient.

Allocation · villages1,000
Estimated budget share62,10,00,00,000
  1. Select 1,000 underserved villages.
  2. Deliver 5,000 of roads and working last-mile fibre.
  3. Fund maintenance and verify household service and end-user uptime.

Road programme-average benchmark and assumed last-mile fibre budget; exceptional land/bridge costs and services beyond five years extra.

Allocation estimate · PMGSY state road targets, FY 2026–27

Initial shares follow published road-delivery targets. Confirm that each selected village needs both road and fibre, with funded maintenance. Zero allocations are outside this phase, not zero need.

36 state / UT allocations → 1,000 villages nationally

Villages · allocation estimate
State / UTVillagesRoad km
Andaman & Nicobar Islands420
Andhra Pradesh37185
Arunachal Pradesh74370
Assam38190
Bihar24120
Chandigarh00
Chhattisgarh143715
Dadra & Nagar Haveli and Daman & Diu00
Delhi00
Goa210
Gujarat525
Haryana00
Himachal Pradesh32160
Jammu & Kashmir41205
Jharkhand54270
Karnataka420
Kerala1680
Ladakh840
Lakshadweep00
Madhya Pradesh58290
Maharashtra36180
Manipur47235
Meghalaya27135
Mizoram1890
Nagaland21105
Odisha945
Puducherry00
Punjab1155
Rajasthan99495
Sikkim840
Tamil Nadu630
Telangana45225
Tripura24120
Uttar Pradesh1890
Uttarakhand21105
West Bengal70350
National total1,0005,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 26,474. State inputs and full model ↓

five-year build; one operating year costed

10,000 affordable rental homes near workplaces

Sources

36,450 / 83,298 new units completed. 43.8%, February 2026; occupancy omitted from the parliamentary reply.

An approved or completed unit is not an occupied affordable home. Land and location drive the economics.

Sizing

Estimated cost · construction plus one operating year₹1,218 croreRange: ₹812 crore–₹1,824 crore

Land, trunk infrastructure and finance excluded; gross project resources before rent revenue or cost sharing.

10,000 × (construction + 12 months O&M). Occupied homes = 10,000 × 70/85/95%.

Assumptions & conditional outcomes

Construction prices and occupancy are assumptions, not PMAY unit-cost norms. Near-work land can dominate cost. Occupancy is not an employment effect; rent plus commute ≤30% of pay is a planned affordability standard.

Low / base / high: 7,000, 8,500, 9,500 occupied homes. Scenarios, not forecasts.

new units
10,000
assumed construction INR each
8,00,000, 12,00,000, 18,00,000
assumed monthly OandM INR each
1,000, 1,500, 2,000
assumed occupancy share
0.7, 0.85, 0.95

National strategy

Build affordable rental homes near workplaces.

10,000 homes

Build in usable locations → affordable rent and commute → occupied homes.

Build 10,000 homes, or 2,000 a year over five years. A 90% occupancy promise requires 9,000 occupied units; the base 85% scenario delivers 8,500, leaving 500 more lettings to achieve. Secure land and enforce rent-plus-commute affordability.

Allocation · homes10,000
Estimated budget share12,18,00,00,000
  1. Secure near-work sites for 10,000 rental homes.
  2. Price land, construction, finance and operation before contracting.
  3. Track occupied homes, rent and commuting costs against earnings.

Land, trunk infrastructure and finance excluded; gross project resources before rent revenue or cost sharing.

Allocation estimate · ARHC reported accommodation-unit backlog, February 2026

Planning shares use a dated accommodation pipeline that includes dormitory beds. It does not verify separate homes or available capacity. Confirm dwelling types, sites, progress and financing. Other states are outside this phase.

36 state / UT allocations → 10,000 homes nationally

Homes · allocation estimate
State / UTHomes
Andaman & Nicobar Islands0
Andhra Pradesh296
Arunachal Pradesh0
Assam474
Bihar0
Chandigarh0
Chhattisgarh474
Dadra & Nagar Haveli and Daman & Diu0
Delhi0
Goa0
Gujarat97
Haryana0
Himachal Pradesh0
Jammu & Kashmir0
Jharkhand0
Karnataka0
Kerala0
Ladakh0
Lakshadweep0
Madhya Pradesh0
Maharashtra0
Manipur0
Meghalaya0
Mizoram0
Nagaland0
Odisha0
Puducherry0
Punjab0
Rajasthan0
Sikkim0
Tamil Nadu5,328
Telangana3,093
Tripura0
Uttar Pradesh238
Uttarakhand0
West Bengal0
National total10,000
How the state totals add up

National scope × state input ÷ sum of listed state inputs; floor, then distribute whole units by largest fractional remainders (alphabetical tie break). School programmes allocate coaches first, then multiply by 20 schools or 200 adaptive pupils per coach.

Baseline denominator: 46,848. State inputs and full model ↓